7-21 Wilson Street
City of London, EC2M
Burke Demolition Ltd was appointed to carry out the enabling works package to this 6 storey office block within the City of London for a new client.
​
Due to the location of the building and accelerated tender process we decided the best way to remove all waste from site would be via 3.5 tonne waste removal vehicles which we was able to load within the building.
​
Works Consisted of:
-
Act As Principal Contractor
-
Carry out Refurbishment & Demolition Survey
-
Carry out Isolations & Disconnections
-
Installation of Temporary Site Power & Fire Alarms
-
Removal of Redundant Roof Plant
-
Full Strip Out Back to Base Build
​​
Recycling Rate: 99.19% ​
Project Duration: 14 Weeks
​
Former Boohoo Ditsribution Warehouse
Wellingborough, Northamptonshire NN8
Burke Demolition Ltd was appointed by a regular client to carry out the demolition of 12,000 sqm of mezzanine and racking system in Wellingborough, Northamptonshire.
​​​​
Works Consisted of:
-
Mechanical Demolition of 12,000 sqm of Mezzanine and Racking Systems
-
Soft Strip of Offices
-
Removal of M&E over 24,000 sqm warehouse ​
​
Recycling Rate: 99.97%
Project Duration: 16 Weeks








Hazel Court Disability Centre
Wandsworth, SW11
Burke Demolition was appointed as principal contractor to demolish the former disability centre located in Wandsworth, London. Working within close proximity to a neighbouring health centre and residential apartment blocks, noise and dust from the demolition process would be our biggest hurdle to over come utilizing the latest dust suppression systems, plant and attachments we carried out the works without any complaints from neighbours and to complete satisfaction of our client
​
Works Consisted of:
-
Internal Soft Strip
-
Isolations and disconnections of services
-
Full Demolition
-
Removal of slabs and foundations to a depth of 6 meters
-
All site won material crushed to a certified 6f2 specification
​​
Fairview PRU, Basildon
Basildon, SS14
Burke Demolition was appointed to carry out the asbestos removal and full demolition of a former pupil referral unit as part of the Essex County Council Frame Work.
​
Works Consisted of:
-
​Internal soft strip
-
Asbestos removal
-
Full demolition
-
Removal of slabs and foundations
-
All site won material crushed to a certified 6f2 specification
​
P
​
​
​
​








Extex Exteriors
Royston, Hertfordshire SG8
Burke Demolition Ltd was appointed to manage and carry out the asbestos removal works and decommissioning of manufacturing plant to the site, with the site still being fully operational everything was planned around the day to day running of the manufacturing site. The site being a former manufacturing plant for asbestos cement roof sheeting means there was a vast amount of removals, environmental cleaning and encapsulation to be carried out.
Burke Demolition appointed a reputable licensed asbestos removal contractor to carry out the licensed asbestos removal works.
Works Consisted of:
-
Non-Licensed Asbestos Removals
-
Licensed Asbestos Removals
-
Decommissioning and Removal of Manufacturing Plant
-
Demolition of Office Block
​
​
7 Beech Hill
Barnet, London EN4
Burke Demolition Ltd was appointed to carry out the total demolition of this large residential dwelling located in Hadley Wood, Barnet.
​
With the neighbouring properties being in close proximity to the dwelling that was to be demolished Burke Demolition had to carry out enabling works to be able to erect the protection scaffold to either side.
​
Works Consisted of:
-
Internal Soft Strip
-
Enabling Works
-
Full Demolition
-
Removal of Slabs and Foundations
​
​